[1]
Kovtun, T. 2021. PECULIARITIES OF DETERMINING THE DISCOUNTED PAYBACK PERIOD OF THE ECO-LOGISTIC SYSTEM PROJECT.
Transport development
. 2(7) (Mar. 2021), 30-41. DOI:https://doi.org/10.33082/td.2020.2-7.03.